0.70$US/Lb
0.24$US/Lb
0.22$US/Lb
0.29$US/Lb
0.74$US/Lb
1009.00$US/MT
1100.00$US/MT
1359.00$US/MT
412.00$US/MT
455.40$US/MT
438.61$US/MT
2553.82$US/MT
2929.69$US/MT
31.62$US/MT
This service is only available to US clients.
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Aluminum Breakage Scrap | 0.12 | 0.12 | 0.12 | USD/LB | 2025-04-25 |
Aluminum Cans Scrap | 0.44 | 0.44 | 0.44 | USD/LB | 2025-04-25 |
Aluminum Car Rims Scrap | 0.62 | 0.63 | 0.62 | USD/LB | 2025-04-25 |
Aluminum Cast Scrap | 0.46 | 0.47 | 0.46 | USD/LB | 2025-04-25 |
Aluminum Painted Siding Scrap | 0.52 | 0.53 | 0.5 | USD/LB | 2025-04-25 |
Aluminum Radiators Scrap | 0.39 | 0.4 | 0.39 | USD/LB | 2025-04-25 |
Aluminum Truck Wheels Scrap | 0.54 | 0.54 | 0.54 | USD/LB | 2025-04-25 |
Aluminum Car Wheels Scrap | 0.5 | 0.5 | 0.5 | USD/LB | 2025-04-24 |
Aluminum Condensers Scrap | 0.4 | 0.4 | 0.4 | USD/LB | 2025-04-24 |
Aluminum Scrap Dirty | 0.18 | 0.19 | 0.17 | USD/LB | 2025-04-24 |
Aluminum Shavings Scrap | 0.2 | 0.2 | 0.2 | USD/LB | 2025-04-24 |
6061 Aluminum Scrap | 0.65 | 0.65 | 0.65 | USD/LB | 2025-03-28 |
Al/Cu Radiators Ends Scrap | 0.5 | 0.5 | 0.5 | USD/LB | 2025-03-28 |
Aluminum Motors Scrap | 0.15 | 0.15 | 0.15 | USD/LB | 2025-03-28 |
Aluminum Painted Extrusion Scrap | 0.62 | 0.62 | 0.62 | USD/LB | 2025-03-28 |
Aluminum Thermal Extrusion Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2025-03-28 |
Aluminum Transmissions | 0.14 | 0.14 | 0.14 | USD/LB | 2025-03-28 |
Aluminum Wire Scrap (No coating) | 0.32 | 0.32 | 0.32 | USD/LB | 2025-03-21 |
Mixed Metal Scrap | 150 | 150 | 150 | USD/Ton | 2025-03-21 |
Aluminum Rims Dirty Scrap | 0.81 | 0.81 | 0.81 | USD/LB | 2025-03-03 |
ACSR Wire Scrap | 0.24 | 0.24 | 0.24 | USD/LB | 2025-02-24 |
Al/Cu Radiators Scrap | 1.31 | 1.32 | 1.31 | USD/LB | 2025-02-24 |
Aluminum MLC Clips Scrap | 0.55 | 0.55 | 0.55 | USD/LB | 2025-02-24 |
Aluminum Sheet Dirty Scrap | 0.1 | 0.1 | 0.1 | USD/LB | 2025-02-24 |
Aluminum Sheet Scrap | 0.39 | 0.39 | 0.39 | USD/LB | 2025-02-24 |
Aluminum Siding Scrap | 0.54 | 0.54 | 0.54 | USD/LB | 2025-02-24 |
Aluminum Turning Scrap | 0.18 | 0.18 | 0.18 | USD/LB | 2025-02-24 |
E.C. Aluminum Wire Scrap | 0.41 | 0.41 | 0.41 | USD/LB | 2025-02-24 |
5052 Aluminum Scrap | 0.62 | 0.62 | 0.62 | USD/LB | 2025-02-13 |
6061 Aluminum Turning Scrap | 0.25 | 0.25 | 0.25 | USD/LB | 2025-02-13 |
Aluminum Bronze Solids Scrap | 2.45 | 2.45 | 2.45 | USD/LB | 2025-02-13 |
Aluminum Bronze Turning Scrap | 2.25 | 2.25 | 2.25 | USD/LB | 2025-02-13 |
Aluminum Litho Scrap | 0.6 | 0.6 | 0.6 | USD/LB | 2025-02-13 |
Aluminum Solids Scrap | 0.3 | 0.3 | 0.3 | USD/LB | 2025-02-13 |
Aluminum Foil Scrap | 0.06 | 0.06 | 0.06 | USD/LB | 2025-02-12 |
Insulated Aluminum Wire Scrap | 0.25 | 0.25 | 0.25 | USD/LB | 2025-02-12 |
Aluminum Semi Rims | 0.49 | 0.49 | 0.49 | USD/LB | 2024-10-25 |
Chrome Wheels Scrap | 0.6 | 0.6 | 0.6 | USD/LB | 2024-10-25 |
Aluminum Scrap | 0.4 | 0.41 | 0.4 | USD/LB | 2024-06-20 |
Aluminum Car Wheels Dirty Scrap | 0.4 | 0.4 | 0.4 | USD/LB | 2024-06-05 |
Aluminum Starters Scrap | 0.33 | 0.33 | 0.33 | USD/LB | 2024-05-20 |
Aluminum Wheels Dirty Scrap | 0.2 | 0.2 | 0.2 | USD/LB | 2023-03-06 |
Extruded Aluminum Scrap | 0.48 | 0.48 | 0.48 | USD/LB | 2023-01-20 |
Aluminum Chrome Car Wheels Scrap | 0.36 | 0.36 | 0.36 | USD/LB | 2022-12-05 |
Aluminum Pop Cans Scrap | 2 | 2 | 2 | USD/LB | 2022-12-05 |
Aluminum Extrusion Scrap | 0.57 | 0.57 | 0.57 | USD/LB | 2021-08-06 |
Painted Aluminum Scrap | 0.45 | 0.45 | 0.45 | USD/LB | 2021-08-06 |
Aluminum Wheels Clean Scrap | 0.56 | 0.56 | 0.56 | USD/LB | 2021-03-10 |
Cast Aluminum Rims Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2021-01-22 |
Aluminum Clean Die Cast Scrap | 0.14 | 0.14 | 0.14 | USD/LB | 2020-04-21 |
Aluminum Die Cast Scrap | 0.44 | 0.44 | 0.44 | USD/LB | 2019-12-17 |
Aluminum Harness Wire Scrap | 0.58 | 0.58 | 0.58 | USD/LB | 2019-05-24 |
Aluminum Breakage Scrap 50% Recovery | 0.5 | 0.5 | 0.5 | USD/LB | 2018-12-05 |
Al/Cu Radiators /Fe Scrap | 0.96 | 0.97 | 0.95 | USD/LB | 2018-05-14 |
Aluminum Radiators /Fe Scrap | 0.28 | 0.28 | 0.28 | USD/LB | 2018-04-02 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Brass Scrap Clean | 1.87 | 1.87 | 1.87 | USD/LB | 2025-04-24 |
Red Brass Scrap | 1.99 | 1.99 | 1.99 | USD/LB | 2025-04-24 |
Yellow Brass Scrap | 1.75 | 1.75 | 1.74 | USD/LB | 2025-04-24 |
Red Brass Turnings Scrap | 2.1 | 2.1 | 2.1 | USD/LB | 2025-02-13 |
Yellow Brass Turnings Scrap | 2.1 | 2.1 | 2.1 | USD/LB | 2025-02-13 |
Brass breakage | 0.91 | 0.91 | 0.91 | USD/LB | 2024-10-25 |
Brass Heater Cores Scrap | 1.22 | 1.22 | 1.22 | USD/LB | 2024-10-25 |
Brass Shell Casings Scrap | 1.89 | 1.89 | 1.89 | USD/LB | 2024-10-25 |
Yellow Brass Unclean Scrap | 0.25 | 0.25 | 0.25 | USD/LB | 2023-02-20 |
Brass Scrap Dirty | 0.4 | 0.4 | 0.4 | USD/LB | 2021-08-06 |
Auto Radiators Scrap | 1.87 | 1.88 | 1.86 | USD/LB | 2021-05-20 |
Dirty Auto Radiators Scrap | 0.58 | 0.58 | 0.58 | USD/LB | 2021-05-20 |
Brass Radiator /Fe Scrap | 0.97 | 0.97 | 0.97 | USD/LB | 2021-03-10 |
Brass Radiator Scrap | 1.77 | 1.77 | 1.77 | USD/LB | 2021-03-10 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
#1 Insulated Copper Wire | 1.4 | 1.4 | 1.39 | USD/LB | 2025-04-25 |
#2 Insulated Copper Wire | 0.73 | 0.74 | 0.72 | USD/LB | 2025-04-25 |
Harness Wire Scrap | 1.17 | 1.18 | 1.16 | USD/LB | 2025-04-25 |
#1 Copper Scrap | 2.76 | 2.76 | 2.76 | USD/LB | 2025-04-24 |
#1 Copper Wire Scrap | 1.62 | 1.62 | 1.62 | USD/LB | 2025-04-24 |
#2 Copper Scrap | 2.8 | 2.81 | 2.8 | USD/LB | 2025-04-24 |
#2 Copper Wire Scrap | 1.69 | 1.69 | 1.69 | USD/LB | 2025-04-24 |
Electric Motors Scrap | 0.16 | 0.16 | 0.16 | USD/LB | 2025-04-24 |
Insulated Copper Wire Scrap 25% Recovery | 0.2 | 0.2 | 0.2 | USD/LB | 2025-04-24 |
Insulated Copper Wire Scrap 50% Recovery | 0.85 | 0.85 | 0.85 | USD/LB | 2025-04-24 |
Insulated Copper Wire Scrap 70% Recovery | 1.78 | 1.78 | 1.78 | USD/LB | 2025-04-24 |
Xmas Lights Scrap | 0.3 | 0.3 | 0.3 | USD/LB | 2025-04-24 |
#2 Insulated Copper Wire 45% Recovery Scrap | 1.4 | 1.4 | 1.4 | USD/LB | 2025-03-28 |
Unclean Cu/Brass Radiator Scrap | 0.95 | 0.95 | 0.95 | USD/LB | 2025-03-28 |
#1 Insulated (Romex) | 1.85 | 1.9 | 1.8 | USD/LB | 2025-03-24 |
Bare Bright Copper Scrap | 3.74 | 3.74 | 3.74 | USD/LB | 2025-02-24 |
Copper Radiators Scrap | 1.7 | 1.7 | 1.7 | USD/LB | 2025-02-24 |
#1 Insulated Copper Wire 75% Recovery Scrap | 2.2 | 2.2 | 2.2 | USD/LB | 2025-02-13 |
#1 Insulated Copper Wire 85% Recovery Scrap | 2.7 | 2.7 | 2.7 | USD/LB | 2025-02-13 |
Copper Contents Scrap | 0.4 | 0.4 | 0.4 | USD/LB | 2025-02-13 |
Copper Turnings Scrap | 3.23 | 3.23 | 3.23 | USD/LB | 2025-02-13 |
Dirty Motors | 0.08 | 0.08 | 0.08 | USD/LB | 2025-02-13 |
Insulated Copper Wire Scrap 65% recovery | 2.05 | 2.05 | 2.05 | USD/LB | 2025-02-13 |
Insulated Copper Wire Scrap 80% Recovery | 2.8 | 2.8 | 2.8 | USD/LB | 2025-02-13 |
Copper Electric Motors | 0.25 | 0.25 | 0.25 | USD/LB | 2025-02-12 |
Cu/Al Radiators /Fe Scrap | 0.93 | 0.93 | 0.93 | USD/LB | 2025-02-12 |
Cu/Al Radiators Scrap | 1.29 | 1.29 | 1.29 | USD/LB | 2025-02-12 |
#3 Insulated Copper Wire Scrap | 0.4 | 0.4 | 0.4 | USD/LB | 2024-10-25 |
Copper Transformer Scrap | 0.41 | 0.41 | 0.41 | USD/LB | 2024-10-25 |
Alternator Scrap | 0.3 | 0.3 | 0.3 | USD/LB | 2024-10-07 |
Starters Scrap | 0.26 | 0.26 | 0.26 | USD/LB | 2024-10-07 |
Insulated Copper Wire Scrap 55% Recovery | 0.8 | 0.8 | 0.8 | USD/LB | 2024-04-05 |
Heater Cores Scrap | 0.97 | 0.98 | 0.96 | USD/LB | 2024-03-20 |
#2 Insulated Copper Wires (Cu 55%) Scrap | 0.8 | 0.8 | 0.8 | USD/LB | 2023-04-20 |
#1 Copper Bare Bright Scrap | 3.04 | 3.04 | 3.04 | USD/LB | 2023-01-20 |
Copper Radiators Scrap (Dirty) | 0.6 | 0.6 | 0.6 | USD/LB | 2021-08-06 |
Brass Shells Scrap | 1.65 | 1.65 | 1.65 | USD/LB | 2021-08-03 |
Copper Sheet Scrap | 2.15 | 2.15 | 2.15 | USD/LB | 2021-03-10 |
#2 Insulated Copper Wire 50% Recovery Scrap | 1.12 | 1.12 | 1.12 | USD/LB | 2020-11-24 |
Copper Clad Scrap | 0.09 | 0.09 | 0.09 | USD/LB | 2020-03-17 |
Copper Scrap Dirty | 1.25 | 1.25 | 1.25 | USD/LB | 2019-10-04 |
#3 Copper Scrap | 0.27 | 0.27 | 0.27 | USD/LB | 2019-09-06 |
#1 Copper Tube Scrap | 2.23 | 2.23 | 2.23 | USD/LB | 2018-12-04 |
#2 Copper Tubing Scrap | 2.08 | 2.08 | 2.08 | USD/LB | 2018-12-04 |
Cu/Brass Radiator Scrap | 1.49 | 1.49 | 1.49 | USD/LB | 2018-12-04 |
Copper Sheet Scrap (Light) | 1.5 | 1.5 | 1.5 | USD/LB | 2018-08-02 |
Auto/Truck Radiators Scrap | 1.44 | 1.44 | 1.43 | USD/LB | 2018-05-14 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Cellular Phones Scrap | 1.5 | 1.5 | 1.5 | USD/LB | 2025-04-24 |
High Grade Board Scrap | 1 | 1 | 1 | USD/LB | 2025-04-24 |
Laptops | 0.35 | 0.35 | 0.35 | USD/LB | 2025-04-24 |
Low Grade Boards Scrap | 0.15 | 0.15 | 0.15 | USD/LB | 2025-04-24 |
TV/Monitors | 0.5 | 0.5 | 0.5 | USD/LB | 2025-04-24 |
Whole Computer Tower | 0.15 | 0.15 | 0.15 | USD/LB | 2025-04-24 |
Cell Phone w/ Battery | 1.25 | 1.25 | 1.25 | USD/LB | 2021-08-06 |
Cell Phones w/o Battery | 1.9 | 1.9 | 1.9 | USD/LB | 2021-08-06 |
Computer/Server (Complete) Scrap | 0.23 | 0.23 | 0.23 | USD/LB | 2021-08-06 |
HARD DRIVES W/BOARDS | 0.15 | 0.15 | 0.15 | USD/LB | 2021-08-06 |
HARD DRIVES W/O BOARDS | 0.05 | 0.05 | 0.05 | USD/LB | 2021-08-06 |
Incomplete Laptops | 0.4 | 0.4 | 0.4 | USD/LB | 2021-08-06 |
Lithium-Ion Battery Scrap | 1 | 1 | 1 | USD/LB | 2021-08-06 |
Mouse/Keyboard Scrap | 0.25 | 0.25 | 0.25 | USD/LB | 2021-08-06 |
Printer/Fax Scrap | 0.25 | 0.25 | 0.25 | USD/LB | 2021-08-06 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Sheet Iron | 165 | 165 | 165 | USD/Ton | 2025-04-24 |
Mixed Iron Scrap | 220 | 220 | 220 | USD/NT | 2025-02-24 |
Unsorted Iron Scrap | 175 | 175 | 175 | USD/NT | 2025-02-24 |
#1 Prepared Iron | 200 | 200 | 200 | USD/NT | 2025-01-23 |
#1 Unprepared Iron | 221.67 | 221.67 | 221.67 | USD/NT | 2025-01-23 |
Sheet Iron | 150 | 150 | 150 | USD/NT | 2024-06-05 |
Sheet Iron Scrap | 95 | 95 | 95 | USD/Ton | 2022-12-15 |
Sheet Iron Scrap | 150 | 150 | 150 | USD/NT | 2022-08-05 |
Cast Iron | 166.67 | 166.67 | 166.67 | USD/NT | 2021-08-13 |
Stove Cast/Sewer Cast | 120 | 120 | 120 | USD/PT | 2021-08-03 |
Torching Iron | 200 | 200 | 200 | USD/PT | 2021-08-03 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Auto Batteries Scrap | 0.21 | 0.21 | 0.21 | USD/LB | 2025-04-25 |
Soft Lead Scrap | 0.44 | 0.44 | 0.44 | USD/LB | 2025-04-25 |
Lead Scrap | 0.41 | 0.41 | 0.41 | USD/LB | 2025-04-24 |
Lead Wheel Weights Scrap | 0.07 | 0.07 | 0.07 | USD/LB | 2025-04-24 |
Lead Batteries Scrap | 0.21 | 0.21 | 0.21 | USD/LB | 2025-02-25 |
Industrial Batteries Scrap | 0.08 | 0.08 | 0.08 | USD/LB | 2025-02-13 |
Car batteries Scrap | 0.19 | 0.19 | 0.19 | USD/LB | 2025-02-12 |
Steel Case Batteries | 0.1 | 0.1 | 0.1 | USD/LB | 2025-02-12 |
Range Lead Scrap | 0.41 | 0.41 | 0.41 | USD/LB | 2024-10-25 |
Scrap Wheel Weights Scrap | 0.15 | 0.15 | 0.15 | USD/LB | 2018-08-02 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Clean Auto Cast | 235 | 235 | 235 | USD/NT | 2025-02-24 |
Stove Cast | 163.33 | 163.33 | 163.33 | USD/NT | 2025-02-24 |
Clean Auto Cast | 115 | 115 | 115 | USD/Ton | 2022-08-05 |
Unclean Gas Motors | 140 | 140 | 140 | USD/PT | 2021-08-03 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Non-Magnetic Stainless Steel Scrap | 0.28 | 0.28 | 0.28 | USD/LB | 2025-04-25 |
18/8 Stainless Steel Scrap | 0.36 | 0.36 | 0.36 | USD/LB | 2025-02-25 |
304 Prepared Stainless Steel Scrap | 0.3 | 0.3 | 0.3 | USD/LB | 2025-02-24 |
316 Stainless Steel Scrap | 0.66 | 0.66 | 0.66 | USD/LB | 2025-02-24 |
Stainless Steel Breakage | 0.12 | 0.12 | 0.12 | USD/LB | 2025-02-24 |
Stainless Steel Turning Scrap | 0.22 | 0.22 | 0.22 | USD/LB | 2025-02-24 |
304 Stainless Steel Turning Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2025-02-13 |
316 Stainless Steel Turning Scrap | 0.5 | 0.5 | 0.5 | USD/LB | 2025-02-13 |
18/8 Stainless Steel Solid Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2022-12-05 |
18-8 Prepared Scrap | 0.7 | 0.7 | 0.7 | USD/LB | 2021-10-20 |
Stainless Steel Scrap | 0.39 | 0.39 | 0.39 | USD/LB | 2021-03-10 |
Stainless Steel Unclean | 0.06 | 0.06 | 0.06 | USD/LB | 2021-03-10 |
Non-Magnetic Stainless Steel Breakage Scrap | 0.02 | 0.02 | 0.02 | USD/LB | 2019-07-12 |
304 Stainless Steel Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2018-10-03 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
#1 Cast Iron Scrap | 152.5 | 152.5 | 152.5 | USD/Ton | 2025-04-25 |
#2 Cast Iron Scrap | 132.5 | 132.5 | 132.5 | USD/Ton | 2025-04-25 |
Junk Cars Scrap | 135 | 135 | 135 | USD/Ton | 2025-04-25 |
Sheet Iron | 117.5 | 117.5 | 117.5 | USD/Ton | 2025-04-25 |
Unclean Motors Scrap | 122.5 | 122.5 | 122.5 | USD/Ton | 2025-04-25 |
Auto Cast Scrap | 197.5 | 197.5 | 197.5 | USD/Ton | 2025-04-24 |
Prepared Steel Scrap | 165 | 165 | 165 | USD/Ton | 2025-04-24 |
Steel Car Wheels Scrap | 165 | 165 | 165 | USD/Ton | 2025-04-24 |
Rebar | 90 | 90 | 90 | USD/NT | 2025-03-28 |
Sheet Iron | 233 | 233 | 233 | USD/NT | 2025-03-28 |
Farm Machinery Scrap | 220 | 220 | 220 | USD/NT | 2025-02-25 |
Unclean Motors Scrap | 90 | 90 | 90 | USD/NT | 2025-02-24 |
#2 Cast Iron Scrap | 0.07 | 0.07 | 0.07 | USD/LB | 2025-02-13 |
Auto Cast Scrap | 0.1 | 0.1 | 0.1 | USD/LB | 2025-02-13 |
#1 Prepared | 119 | 119 | 119 | USD/Ton | 2024-10-25 |
#1 Unprepared | 77 | 77 | 77 | USD/Ton | 2024-10-25 |
Tin | 70 | 70 | 70 | USD/Ton | 2024-10-25 |
Unprepared Steel Scrap | 145 | 145 | 145 | USD/Ton | 2024-09-04 |
#1 Prepared Scrap | 119 | 119 | 119 | USD/Ton | 2024-07-25 |
3 Foot Steel Scrap | 200 | 200 | 200 | USD/NT | 2024-06-20 |
#1 Prepared Steel Scrap | 130 | 130 | 130 | USD/Ton | 2024-05-06 |
Tin | 70 | 70 | 70 | USD/NT | 2024-04-05 |
Auto Cast Scrap | 241 | 241 | 241 | USD/NT | 2023-12-20 |
#1 Unprepared Steel | 162.5 | 162.5 | 162.5 | USD/Ton | 2023-08-22 |
Steel Turnings Scrap | 10 | 10 | 10 | USD/NT | 2023-05-22 |
Unprepared Shearing | 115 | 115 | 115 | USD/Ton | 2023-05-22 |
Heavy Torch Steel Scrap | 160 | 160 | 160 | USD/NT | 2022-10-17 |
Sheet Iron | 102.5 | 102.5 | 102.5 | USD/Ton | 2022-08-22 |
Unprepared Steel Scrap | 112.5 | 115 | 110 | USD/Ton | 2022-08-22 |
Clean Auto Cast | 175 | 175 | 175 | USD/NT | 2022-02-07 |
Car Bodies | 75 | 75 | 75 | USD/MT | 2021-08-17 |
#1 Prepared | 215 | 215 | 215 | USD/NT | 2021-08-06 |
#1 Unprepared | 175 | 175 | 175 | USD/NT | 2021-08-06 |
Long Steel Scrap | 200 | 200 | 200 | USD/PT | 2021-08-03 |
Motor/Machine Cast | 240 | 240 | 240 | USD/PT | 2021-08-03 |
Short Steel Scrap | 240 | 240 | 240 | USD/PT | 2021-08-03 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Shred/Tin | 0.06 | 0.06 | 0.06 | USD/LB | 2025-02-13 |
Tin | 130 | 130 | 130 | USD/NT | 2023-05-22 |
Shred/Tin | 105 | 105 | 105 | USD/NT | 2021-09-20 |
![]() | ![]() | ![]() | ![]() | Price Unit | ![]() |
---|---|---|---|---|---|
Zinc Die Cast Scrap | 0.3 | 0.3 | 0.3 | USD/LB | 2025-04-25 |