Material | Average Price | High Price | Low Price | Price Unit | Price Date |
---|---|---|---|---|---|
#1 Copper Scrap | 3.1 | 3.1 | 3.1 | USD/LB | 2024-02-20 |
#2 Copper Scrap | 2.76 | 2.76 | 2.76 | USD/LB | 2024-02-20 |
#2 Insulated Copper Wires (Cu 55%) Scrap | 1.19 | 1.19 | 1.19 | USD/LB | 2024-02-20 |
#3 Insulated Copper Wire Scrap 30% Recovery Scrap | 0.54 | 0.54 | 0.54 | USD/LB | 2024-02-20 |
Bare Bright Copper Scrap | 3.2 | 3.2 | 3.2 | USD/LB | 2024-02-20 |
Electric Motors Scrap | 0.29 | 0.29 | 0.29 | USD/LB | 2024-02-20 |
Insulated Copper Wire Scrap 80% Recovery | 1.53 | 1.53 | 1.53 | USD/LB | 2024-02-20 |
#2 Insulated Copper Wire Scrap 60% Recovery Scrap | 1.17 | 1.17 | 1.17 | USD/LB | 2021-12-04 |
Insulated Copper Wire Scrap 70% Recovery | 1.53 | 1.53 | 1.53 | USD/LB | 2021-12-04 |