Material | Average Price | High Price | Low Price | Price Unit | Price Date |
---|---|---|---|---|---|
#1 Copper Bare Bright Scrap | 3.65 | 3.65 | 3.65 | USD/LB | 2024-11-01 |
#1 Copper Pipe Scrap | 3.55 | 3.55 | 3.55 | USD/LB | 2024-11-01 |
#1 Copper Wire Scrap | 3.55 | 3.55 | 3.55 | USD/LB | 2024-11-01 |
#1 Insulated Copper Wire 75% Recovery Scrap | 2.55 | 2.55 | 2.55 | USD/LB | 2024-11-01 |
#2 Copper Pipe Scrap | 3.4 | 3.4 | 3.4 | USD/LB | 2024-11-01 |
#2 Copper Wire Scrap | 3.4 | 3.4 | 3.4 | USD/LB | 2024-11-01 |
Alternator Scrap | 0.57 | 0.57 | 0.57 | USD/LB | 2024-11-01 |
Brass Refinery Scrap | 1.25 | 1.25 | 1.25 | USD/LB | 2024-11-01 |
Copper Breakage Scrap | 0.13 | 0.13 | 0.13 | USD/LB | 2024-11-01 |
Copper Sheet Scrap | 3.3 | 3.3 | 3.3 | USD/LB | 2024-11-01 |
Electric Motors Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2024-11-01 |
Harness Wire Scrap | 1.5 | 1.5 | 1.5 | USD/LB | 2024-11-01 |
Insulated Copper Wire Scrap 65% recovery | 2.23 | 2.23 | 2.23 | USD/LB | 2024-11-01 |
Starters Scrap | 0.47 | 0.47 | 0.47 | USD/LB | 2024-11-01 |
Xmas Lights Scrap | 0.35 | 0.35 | 0.35 | USD/LB | 2024-11-01 |
#1 Copper Tube Scrap | 3.35 | 3.35 | 3.35 | USD/LB | 2024-09-11 |
#2 Copper Tubing Scrap | 3.2 | 3.2 | 3.2 | USD/LB | 2024-09-11 |
Heater Cores Scrap | 1.4 | 1.4 | 1.4 | USD/LB | 2024-08-22 |
#2 Copper Scrap | 3.05 | 3.05 | 3.05 | USD/LB | 2024-02-05 |
#2 Insulated Copper Wire 35% Recovery Scrap | 0.75 | 0.75 | 0.75 | USD/LB | 2023-11-06 |
#2 Insulated Copper Wire 45% Recovery Scrap | 1.05 | 1.05 | 1.05 | USD/LB | 2023-11-06 |
Steel Coated Copper Wire Scrap | 0.33 | 0.33 | 0.33 | USD/LB | 2022-12-05 |