Caron Pipe Jacking, Inc. was founded in Connecticut in 1966 by Ernest Caron and his wife Florine; specializing in subsurface crossings in both pipe jacking and horizontal boring. Today their daughter, Jackie Caron Mals, is the President. Daniel, David and Alan Caron are supervisors of the family oriented business which has grown to be one of the most experienced in New England.
Jacqueline Caron Mals - 30 years experience with the office procedures, finances and accounting; 15 years as President.
Deborah Tardif - 20 years Office Manager and Safety Manager; responsible for confined space requirements at the job sites; provides training sessions and responsible for OSHA compliance.
David Caron - 30 years experience in trenchless technology; Estimator; Project Coordinator; member of the Society of Explosives Engineers. Supervisor; experience with pipe jacking, horizontal boring, rock tunnels and worked with soil stabilization and cementatious grouting.
Daniel Caron - 35 years experience; Foreman; supervises laborers; experience with pipe jacking, horizontal boring, rock tunnels, pit installations, construct coffer dams, work with soil stabilization subcontractor, cementatious grouting, worked with Micro Tunneling Contractor.
Each supervisor has a minimum of 20 years experience with trenchless technology. Caron's laborers weld and hold blasting licenses.
Caron Pipe Jacking, Inc. installs steel casings by thejacking method, sizes range from 42" to 144", Steel casing by the Boring Method 12" to 42" - Reinforced concrete pipe designed for jacking pressures by the jacking method with wall sizes ranging from 36" to 120" - We have also installled by the jacking method concrete box culverts 7' x 7' and 14' x 14', both Culverts were used as a pedesetrian tunnel under the Railroads to insure the safety if the pedestrians.
Caron can also provide soil stabilization (sodium silicate and bicarbonate of soda) as an extra when conventional dewatering applications are not effective to provide a dry and stable surface.
Pipe Jacking Procedure
Pipe Jacking consists of advancing pipe through the ground with thrust provided by hydraulic jacks and excavation of soil at the front of the pipe string either manually or mechanically. The process requires personnel entry into the pipe being jacked to excavate by hand. The hand excavation is usually accomplished inside a shield attached to the leading section of pipe. The shields are typically articulated which allows some degree of line and grade control. The purpose of the shield is to provide a safe working environment for the workers and allow the bore to stay open for the pipe to be jacked into place. Typically, pipe jacking is done with pipes 42 to 120 inches in diameter and Boz culverts 7' to 14'. Pipe jacking is typically used in soil types with low permeability and good standup time or in soils that have been dewatered or otherwise prestabilized by ground improvement methods such as grouting.
Company Name | Caron Pipe Jacking, Inc. |
Business Category | Steel/Iron |
Address | 77 Willow Brook Drive Berlin Connecticut United States ZIP: 06037 |
President | NA |
Year Established | 1966 |
Employees | NA |
Memberships | NA |
Hours of Operation | NA |
Phone Number | Locked content | Subscribe to view |
Fax Number | Locked content | |
Locked content | ||
Website | Locked content |