Boydel Companies consists of three entities as linked through portals on this page:
Our WaterMiner™ water scrubbing technology consists of a globally patented or patent pending electrochemical device and process that has been under in house development and external validation over the previous 4.5 years. The proprietary Boydel EC wastewater treatment reactor is a two stage hybrid electrocoagulation- electrolysis design that has no plates, is self-cleaning, and employs a rotating cathode that drills down on the sacrificial anode; with a PLC managed adjustable gap control that insures optimum and minimal electrical consumption..... on the order of $50 per day at 1,000,000 lpd raw sewage treatment flows.
The WaterMiner™ routinely treats raw sewage in 15 minutes to cBOD <40 mg/L and <15 mg/L TSS at commercial flows and with a quick MBBR polish the treatment performance improves to cBOD <20 mg/L and <10 mg/L TSS. Robust 100% water disinfection is developed in the insitu electrolysis stage. Further the WaterMiner™ has proven very capable to routinely treat raw septage mixed with up to 30% FOG and porta potty waters to similar relative treatment levels at direct reactor consumables costs of about u$0.25 – 0.30 m3.
Much more detailed information about this technology is included inside theelectrocoagulation portal immediately to the right.
We are now initiating a worldwide effort to discover and engage new and additional technology partners and/or full licensee's to commercialize, our "step change", 15 minute retention time, electrochemical wastewater scrubbing technology. We are very confident that our "no tank farm", fully enclosed treatment process will provide a huge technological and innovative advantage to any wastewater treatment plant company that is able to introduce it. Please open the "news" tab in the BoydelElectrocoagulation Technology portal for more information and from the contact page, which I monitor directly, to discuss your interest in participating with us.
BOYDEL's trailer mounted modules are transportable, without permits, behind a common semi-tractor highway unit. The plant will be rolled up to your wastewater site and disconnected from the tractor.
There are four connections required to begin a pilot:
kWh 208 3ph power supply.
That's it.
In as little as a day we are able to ramp up to full production flows of the WaterMiner™ unit. Depending on feedstock challenges proper dial in and polymer selection can take only a day or up to two weeks or more.
Samples can/will be captured and sent for lab testing by the client and /or Boydel provided operators. Consumables and operating costs will be captured and calculated with a report for same provided to the client.
Presuming an acceptable treatment level is achieved at a beneficial cost to the customer, a formal business proposal can be developed and presented.
Company Name | Boydel Wastewater Technologies Inc |
Business Category | Minerals Recycling |
Address | PO Box 1409 Ladysmith British Columbia Canada |
President | NA |
Year Established | NA |
Employees | NA |
Memberships | NA |
Hours of Operation | NA |
Phone Number | Locked content | Subscribe to view |
Fax Number | Locked content | |
Locked content | ||
Website | Locked content |