ARE Deutzen GmbH
For over 20 years we have been a leading partner for projects in the field of contaminated site remediation, revitalization and disposal. As an independent company, we focus our activities on Europe.
In Deutzen, we have been operating a thermal soil treatment plant with a rotary kiln for treating contaminated soil, oil sludge and mineral waste since 1994. The Thermik is certified according to ISO 9001, 14001 and 18001 and has a corresponding immission control permit. It may treat soils with pollutants such as MKW, BTEX, phenols, PAHs, nitrotoluenes, cyanides, CHCs and PCBs. We also take on challenging projects in the field of material flow management and the remediation of contaminated sites.
We have developed into an expert and German market leader in the field of thermal soil treatment and will continue to rely on extensive process know-how in the future so that we can continue to offer optimal customer service for the remediation of contaminated sites. In the last 20 years we have treated more than 1.8 million tons of mineral substances.
For us, environmental awareness, the latest environmental technology, safety, economic efficiency and correct behavior simply belong together. And that from planning to execution and disposal.
Company history
2020
Mr. Thiel becomes the sole managing director of the company.
2019
Appointment of Dipl.-Geol. Jürgen Thiel as the company's second managing director
2018
Replacement of the 15-year-old rotary kiln with a new one
2015
The sales office in Bonn will be opened in January 2015.
2015
The service portfolio is expanded to include the environmental remediation business area with a focus on material flow management and the remediation of contaminated sites.
2014
Our company takes over the initials from its new majority shareholder and has been trading as ARE Deutzen GmbH since March 25, 2014.
2013
ARE Beteiligungen GmbH, together with Mr. Manfred Garrels, acquires all shares in the company in Deutzen and releases them from the eneotech group.
2012
With the completion of the acquisition and securing of pre-emptive rights of the previously unused neighboring properties, the company has sufficient expansion space for future growth.
2011
"Eneotech" is registered as a trademark. As of April 15, 2011, we will use the name eneotech Entsorgungsdienstleistungen GmbH as part of this group of companies.
2010
Our parent company at the time, Bilfinger Berger Umweltsanierung GmbH, together with its subsidiaries in Deutzen and Chertsey (UK), is being sold by the Bilfinger Group to a financial investor.
2007
Extensive investments in buildings and infrastructure at the Deutzen location. 2006 Mr. Dipl.-Bauing. Manfred Garrels joins the management of our company.
2005
The company's name is changed to Bilfinger Berger Disposal Ost GmbH.
2004
1,000,000 tons have been successfully treated since the soil treatment plant was commissioned.
2003
Bilfinger Berger AG acquires all of the shares and renames the company to Bilfinger Berger Disposal GmbH.
2001
After merging with the Bremen-based AAE Abfall- und Altlastenentsorgungsgesellschaft mbH, we were renamed AAE Abfall- und Altlastenentsorgungsgesellschaft mbH. In addition, the Kali + Salz Group participated in our company with a blocking priority.
1999
Increase in output of the thermal desorption plant from 80,000 t / year to now 120,000 t / year through investments to optimize the rotary kiln.
1998
Our soil treatment plant in Deutzen is sold to the Kulturbodenwerk Hanse Beteiligungs-GmbH, which was founded in Bremen in 1988. Thereby, the Umwelt-Nord GmbH & Co. became our new shareholder, who renamed the company to the Deutzen GmbH. From a legal point of view, today's ARE Deutzen GmbH was founded in 1988.
1996
The storage capacity of the floor treatment plant is doubled by investing in a second hall. The covered storage area now covers 44,000 m².
1994
The thermal desorption system goes into operation.
1993
On 02/23/1993 the story of our soil treatment plant starts with Broerius Bodensanierung und Umwelt GmbH, which was founded in Bremen in 1992. The company is building Hall I and an administration building at our location in Deutzen.
Company Name | ARE Deutzen GmbH |
Business Category | Waste Management |
Address | Fabrikstrasse 7 Neukieritzsch Sachsen [Saxony] Germany ZIP: 04575 |
President | NA |
Year Established | NA |
Employees | NA |
Memberships | NA |
Hours of Operation | Monday - Friday 7am–5pm Sat&Sun- Closed |
Phone Number | Locked content | Subscribe to view |
Fax Number | Locked content | |
Locked content | ||
Website | Locked content |
Name | Position | Contact Details | Subscribe to view |
*** | Managing Director | Locked content | |
*** | Sales Manager | Locked content | |
*** | Sales national | Locked content | |
*** | Sales national | Locked content | |
*** | Material flow management | Locked content | |
*** | Soil assumption | Locked content | |
*** | Soil assumption | Locked content | |
*** | Authorized signatory | Locked content | |
*** | Authorized signatory | Locked content | |
*** | Accounts Payable | Locked content | |
*** | Accounts Receivable | Locked content |