Chiresa AG
Landstrasse 2 , Turgi, Aargau, Switzerland | Waste Management
Chiresa AG is a modern integrated waste management company. In the field of hazardous waste, she works out ecologically and economically sensible solutions for the reduction, recovery, recycling and disposal of hazardous waste.
From individual services to complete solutions, Chiresa AG is the ideal and reliable partner for industry, commerce, trade, private and municipal companies
HISTORY
For more than 40 years.
1977
Foundation of Chiresa AG in La Chaux-de-Fonds.
Trade in recyclable and recycled products.
1978 - 1985
Expansion of services: trading in goods and chemical waste for reuse (recycling) and recycled goods, operation of a chemical-analytical laboratory and disposal of industrial waste.
1986
acquisition of a transport fleet; Tank trucks for special liquid waste; equipped for dangerous goods.
1987 - 1989
Export of waste to Germany and England, as there was a need to dispose of hazardous waste in Switzerland.1992 move to Rudolfstetten. Expansion of the range of services
1995
Opening of a plant in Leibstadt. Receipt of the first recipient permits. Operation of a drying plant for metal hydroxide sludge in Leibstadt.
1996
Takeover of the Turgi site and relocation of the company headquarters to Turgi. Recipient permit with almost all VVS codes (VeVA code)
2001 - 2002
certification according to ISO 9001/14001; Introduction of the QM system.
2002 - 2003
Expansion of the core competence dismantling, dismantling and renovation, e.g. major order for the dismantling of the sulfuric acid and oleum production plant in Full.
2004
Operating license for the treatment and storage of photo wastewater in Full. Collaboration in the dismantling and renovation of a chlorine / alkali electrolysis.
2005
Expansion of the handling and production range and commissioning and operating license for the storage of solids in Full Hall 33. Four-year contract for pollutant collections in the canton of Zurich
2007
Construction and commissioning of the rail tank car and tank interior cleaning system in Full.
2008
Dismantling of a decommissioned electroplating plant in Reinach (BL)
Dismantling of a tank with residues with white phosphorus in Bex (VS)
Feasibility study for the disposal of approx. 20,000 t of chemical residues in Prishtina (Kosovo) on behalf of the World Bank.
Building permit for a tank farm for flammable substances in Turgi.
Acquisition of a locomotive for the Full branch
2009
Extension of the field service with two new employees.
Facade
renovation in Turgi Asbestos removal in Basel accompanied by SUVA.
Renovation of the Bonfol hazardous waste dump (Kt. JU): Order placed by HIM GmbH for the on-site
preparation of the waste. Contract signing.
2010
Refurbishment of the Bonfol hazardous waste dump:
- Employment of 18 new employees
- Pilot phase ( April 12, 2010 to July 6, 2010 )
- Explosion in the excavation hall on July 7, 2010. Project standstill until April 11th, 2011
- Purchase of a house in Boncourt
- Investment for approx. 3.0 million CHF
Decontamination and dismantling of a military light-emitting measuring system in Thun
Renewal of the fire protection and fire alarm system in Turgi
Acquisition of an alloy tank container
2011
Rehabilitation of the Bonfol hazardous waste dump: start of pilot phase 2 (April 11, 2011)
Renewal of the control of the chemical-physical plant in Turgi
Approval by SUVA as an asbestos removal company
2012 Renewals: Control in the CP system, laboratory in Turgi
Commissioning of a new tank farm for flammable substances in Turgi
2013
Refurbishment of the safety basin in Turgi
Bonfol: 3.5 months interruption due to the relocation of the hall
2014 New ERP system introduced
Partial renewal of the vehicle fleet to Euro 6
Extension of the CP system in Turgi by an oxidation stage
2015
Start of planning for filter dust processing from waste incineration plants at the Full site
2016
Commissioning of the ' AluResa ' processing plant in Full-Reuenthal
Completion of the preliminary project for the tank farm at the Full site
2017
Purchase of the Full-Reuenthal area with 35,000 m².
Purchase and commissioning of a sludge drying plant.
Completion of the Bonfol project
2018
Start of construction of the tank farm for organic liquids in Full-Reuenthal
Company Details | |
---|---|
Company Name | Chiresa AG |
Business Category | Waste Management |
Address | Landstrasse 2 Turgi Aargau Switzerland ZIP: 5300 |
President | NA |
Year Established | 1977 |
Employees | NA |
Memberships | NA |
Hours of Operation | Monday - Thursday 7.30 a.m. - 11.30 a.m. 1 p.m. - 4.30 p.m. Friday 7.30 a.m. - 11.30 a.m. 1 p.m. - 3 p.m. |
Similar Companies
- East Tennessee Portables (ETP)
Knoxville,United States
- Trey's Dumpster Services
Shreveport,United States
- RJL Rent A Bin, LLC
Chatsworth,United States
- J.S. Bellis Ltd
Woodstock,Canada
- Premier Disposal Services LLC
Hoover,United States